I need to make a diagram for completion-review-revision-approval process of technical drawings. The diagram needs to show both the process milestones (completion-review-revision-approval) and also their schedule distributed on weeks.

However I cannot imagine graphically how can I show both the milestones and the schedule.

For example, there are 3 drawings lets say:

Drawing A will be - completed between Week 1-3 - reviewed between Week 3-4 - revision between Week 4-5 - Approved on Week 6

Drawing B will be

  • completed between Week 1-4
  • reviewed between Week 4-5
  • revision between Week 5-6
  • Approved on Week 7

Drawing C will be

  • completed between Week 3-5
  • viewed between Week 5-6
  • revision between Week 6-7
  • Approved on Week 8

As you can understand, the milestone dates of drawings are distributed into the weeks and intersecting with each other. For example, while the revision of Drawing B is going on, Drawing A is already approved.

Normally we show these process with Gantt chart but I am looking for alternative cool ideas.

I hope explanation of my question is clear to you.

Thanks.

2
  • Howabout a Gantt chart was pretty hot stuff in the 1910, but very used in timetables since then. You can do pretty cool cant charts.
    – joojaa
    Mar 18, 2014 at 19:01
  • 2
    So, as I interpret it, the question is basically, "How can I better display data?" We're visual people around here :) Showing what you have or would traditionally create, will go a long way to gaining some alternative methods to display the same data.
    – Scott
    Mar 18, 2014 at 19:22

1 Answer 1

2

From a graphic design perspective, it's good to keep in mind that what is familiar is what communicates most easily. People don't like finding they have to decode something that ought to be instantly intuitive. That said...

Since you have dependencies in this process (a drawing can't be approved until it's been reviewed and revised, all drawings must be approved before the process is complete), you could represent it with a simple critical path or PERT diagram (not necessarily like the one below).

enter image description here

The boring old, standard old Gantt chart can also be spiffed up a bit, perhaps along these lines, using a different color set for each track, or using color to represent each of the different processes on the various document timelines.

enter image description here

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge that you have read and understand our privacy policy and code of conduct.

Not the answer you're looking for? Browse other questions tagged or ask your own question.